Nuclear Regulatory Commission· Proposed Rule
Draft Regulatory Guide: Quality Assurance Program Criteria (Design and Construction)
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft regulatory guide (DG), DG-1403, “Quality Assurance Program Criteria (Design and Construction).” This DG is proposed Revision 6 of Regulatory Guide (RG) 1.28 of the same name. The proposed revision endorses Nuclear Energy…
Owner check — Save the source link and verify whether this changes costs, compliance, financing, vendors, customers, or operations.